Rebuild every size, or adapt one approved master?
Both approaches can deliver good work. They differ in where the effort goes: manual production spends it on rebuilding layouts, guided production spends it on reviewing outputs.
- Same creative decisions
- Different effort curve
- Human review either way
- No credit card required · Full per-size control
Where the two approaches actually differ.
The creative decisions are identical. What changes is how much of the process repeats per format.
Manual resizing
Each format is rebuilt in the design file: reposition, rescale, re-wrap, re-export. Effort grows with every size added to the media plan.
Guided production
Formats are generated from the approved master with brand rules applied, then reviewed and edited individually before export.
Time profile
Manual: long production, short review. Guided: short production, structured review — the same care, applied later in the process.
Consistency
Manual consistency depends on discipline per file. Guided consistency comes from shared Brand Kits applied to every output.
Per-size control
Both allow it. In guided production it is an editing step on a generated output rather than a rebuild from scratch.
Scaling behaviour
Manual cost tracks the number of sizes. Guided cost tracks the number of campaigns, with review time per size.
A simple decision rule.
Volume and repetition decide this, not preference.
- Recurring placement lists → guided production
- Many markets or languages from one master → guided production
- Bespoke art direction per placement → manual
- Complex illustration or retouching → manual
- Tight deadlines with a fixed format list → guided production
- One-off formats that will never repeat → manual
What goes wrong in either model.
- Starting adaptations before the master is genuinely approved
- Treating generated outputs as final without a review pass
- Keeping brand rules in a document instead of in the production setup
- Collecting feedback per size instead of in one structured round
- Comparing costs without counting review and rework time
Frequently asked questions
What is guided creative production?
Does guided production remove designer control?
When is manual resizing still the right choice?
How do the two approaches compare on cost?
Can both approaches coexist?
Related resources
The Tadvio Creative Production Workflow, Step by Step
5 min read
Why Approved Creatives Break When Adapted to New Formats
7 min read
How to Build a Reusable Brand Kit for Campaign Production
6 min read
Ad Format Reference: Square, Portrait, Story, Landscape and Banner
8 min read
Custom Fonts Across Multi-Market Creative Production
8 min read
Ready to automate your creative production?
Start with one approved creative, produce every required size, and keep full control over each output before export.
No credit card required · Full per-size control
